Double girder EOT crane's load tests for GARCIA, S.A. in Viana do Castelo
Installation in GARCIA, GARCIA, S.A. in Viana do Castelo (Portugal), of a double girder EOT crane with two hoists of 40/40t of lifting capacity, 10 metres of lifting height and 24,30 metres of crane span.
follow us on
ACCIONA Infrastructures corporative video
ACCIONA Infrastructures corporative video, where we can see a gantry crane from GH.
Second video of Alstom plant in Saint-Nazaire (France)
Saint-Nazaire: The first production plants offshore wind turbines in France.
ACCIONA Windpower AW3000 Turbines at the Pioneer Grove Wind Farm
ACCIONA Windpower's Pioneer Grove Wind Farm is the first installation of the AW3000 turbine in North America.
Video of Alstom plant in Saint-Nazaire (France)
Saint-Nazaire: The first production plants offshore wind turbines in France.
Video of installation plant Ternium Siderar, Argentina
Plant installation at Siderar, San Nicolás, Buenos Aires.