Dry docking: the simplest solution to increase boatyard capacity and improve service without underta
Dry Docking Facility in Barcelona:
Maximum boat dimensions: 9 m | 4 tonnes
Automated retrieval time: Every 5-8 minutes
Capacity: 222 vessels
follow us on
Section Escoriatza Aramaio AVE Vitoria Bilbao San Sebastián
Technical Video on the design and construction of the section between Escoriatza and Aramaio of High Speed Line Vitoria-Bilbao-San Sebastián in which a GH CRANES & COMPONENTS bridge crane appears. To save big orographic slopes of the area, this stretch of 5.5km has three viaducts and four tunnels.
Offshore wind turbine: Haliade 150 - 6 MW
Offshore wind turbine: Haliade 150 - 6 MW.
Transfer car for Gestamp
Transfer car in batteries of 40 Tn capacity.
ACCIONA Infrastructures corporative video
ACCIONA Infrastructures corporative video, where we can see a gantry crane from GH.
Second video of Alstom plant in Saint-Nazaire (France)
Saint-Nazaire: The first production plants offshore wind turbines in France.