Dry docking: the simplest solution to increase boatyard capacity and improve service without underta
Dry Docking Facility in Barcelona:
Maximum boat dimensions: 9 m | 4 tonnes
Automated retrieval time: Every 5-8 minutes
Capacity: 222 vessels
follow us on
Gipuzkoa 4.0 Advanced Manufacturing Network
In order to promote the transformation to industry 4.0, the Provincial Council of Gipuzkoa has created a collaborative and pioneering programme in which leading companies and cutting-edge technological centres will share their achievements with the SMEs of Gipuzkoa.
Embraer Commercial Aircraft
Video news about the realization of the last commercial aircraft of Embraer for which they have been aided by bridge cranes of GH CRANES & COMPONENTS.
LGH: The story of a passion
This video contains the synthesis of the cooperation project between GH and Peera lehoakarniyon.
Corporate Video of Smarktec
Corporate video of Smarktec showing a GH Bridge Crane with a 10t lifting capacity hoist.
TIRME energy recovery plant
Video demonstrating the operation of the energy recovery plant in Mallorca, where GH CRANES & COMPONENTS overhead cranes are installed.