The production of voussoirs is in progress.
With the use of the GH CRANES & COMPONENTS gantry cranes the prefabricated concrete voussoirs are transported into the tunnel. The three tunnelling machines that are operating carry out the task of lining the tunnel with the voussoirs.
ELECNOR Infrastructures Angola – Load tests Test run for a Monorail Crane of 3.2 tonnes. AW3000 Windpower Rise Above Acciona Installations. AW3000 wind turbine construction, WindpowerRiseAbove. New Steel Billet Continuous Casting Machine In mid 2012 one of our best customers began the construction of a new Steel Billet Continuous Casting machine. After a year and a half of hard work, it started working with GH CRANES & COMPONENTS in it. CAF Company facilities in Brazil. CAF train factory for the Caracas Metro ← « 41 42 43 (current) 44 45 » →
Test run for a Monorail Crane of 3.2 tonnes.
Acciona Installations. AW3000 wind turbine construction, WindpowerRiseAbove.
In mid 2012 one of our best customers began the construction of a new Steel Billet Continuous Casting machine.
After a year and a half of hard work, it started working with GH CRANES & COMPONENTS in it.