Assembly of a GH jib crane with a lifting capacity of 5t, a height of 5m and a length of 8 metres, installed in Puerto Berrio, in Colombia, on the banks of the Magdalena River.
follow us on
Luagher Corporative Video
EOT Crane Engineering and Construction.
Cosentino Corporative Video 2014
Grupo Cosentino distributes its brands in over 60 countries.
ACCIONA Windpower’s main market (Brazil)
The ACCIONA Group has contracts in the country – either signed or contingent - for the supply of turbines totaling 837 megawatts (MW).
Lecitrailer Corporative video 2014
Lecitrailer Corporative video 2014, Spanish towing and semi-towing manufacturer.
Harbin Hafei Airbus
Composite Manufacturing Centre - Opening Ceremony 28 February 2011