The Proton Therapy Unit building has been Completed (Clínica Universidad de Navarra in Madrid)
The building for the Proton Therapy Unit (Clínica Universidad de Navarra in Madrid) has been finished with the help of several GH CRANES & COMPONENTS cranes.
follow us on
Start of Operations at XEOS and New Opening
XEOS, a joint venture between GE Aviation and Lufthansa Technik, has started service operations and opened its new facilities at ŚrodaŚląska (Poland), where several GH CRANES & COMPONENTS bridge cranes are installed.
5t gantry crane in Algeria
Video of 5t gantry crane in operation with a hydraulic bucket in Algeria.
Gantry Crane Installed in Norway
Double-rail gantry crane with a 2x16t lifting capacity for Datek installed in Norway.
Optimize the customized after-sales service
A project to enhance and optimize the customized after-sales service of its cranes.
Rail Tunnels Follo Line
GH CRANES & COMPONENTS gantry cranes are present in the important project of the longest rail tunnel construction of Norway.