The Proton Therapy Unit building has been Completed (Clínica Universidad de Navarra in Madrid)
The building for the Proton Therapy Unit (Clínica Universidad de Navarra in Madrid) has been finished with the help of several GH CRANES & COMPONENTS cranes.
follow us on
AW3000 maximum efficiency winds power in Brazil
AW3000 maximum efficiency winds power in Brazil.
Industrial Center Ternium
This steel complex is the most advanced of all Latin America for its technology, automotive level and environmental impact.
Double girder EOT crane's load tests for GARCIA, S.A. in Viana do Castelo
Installation in GARCIA, GARCIA, S.A. in Viana do Castelo (Portugal), of a double girder EOT crane with two hoists of 40/40t of lifting capacity, 10 metres of lifting height and 24,30 metres of crane span.
Megarob project
Making the future with next-generation industrial robotics.
Corporate video of GH CRANES & COMPONENTS in Portugal